Read all 8 facility examples, 43 equipment records, 35 sources and 28 glossary terms without JavaScript.
Research register: 2026-09-28. Dates record the preserved research; they do not imply that every source was checked again.
Every preset is an editorial teaching assumption. No universal category threshold, engineering capacity assessment, or current operating data is implied. Source IDs support concepts only, not the exact numeric presets.
Facility examples
Server room · Edge installation · Enterprise data center · Colocation facility · Hyperscale/cloud campus · Superintelligence Factory · Prefabricated modular site · Home lab
FACILITY EXAMPLE
Server room
A few racks inside a larger host building.
- Commercial model
- internal
- Workload
- general purpose
- Construction / packaging
- host building room
- Deployment role
- on premises
Sources: [T02] [T03]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: dx-room
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
Some upstream building services are shown faded outside the local installation boundary.
No local generator is drawn; UPS autonomy and business continuity are not estimated.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 10
- Modeled racks
- 2
- Rack-group allocation
- 2 × 5 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one room in a mixed-use building
- Rooms
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 20
- Modeled racks
- 4
- Rack-group allocation
- 4 × 5 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one room in a mixed-use building
- Rooms
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 50
- Modeled racks
- 10
- Rack-group allocation
- 10 × 5 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one room in a mixed-use building
- Rooms
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Power path
Shared supply → host-building panel → local UPS → rack outlets → server power supply
Utility feed → Transformer → Power distribution panel → Uninterruptible power supply → Rack power distribution unit → Server power supply
energy flow
Substation denotes an upstream functional zone; transformer denotes its or the service voltage-conversion equipment, not a mandatory extra series device.
UPS bypass paths, breakers, protection, redundant feeds, battery-converter architecture and control sequences are intentionally omitted.
For small examples upstream shared-building equipment is faded outside the local boundary.
The panel in this selected example is upstream of the local UPS. Larger systems may have an additional downstream IT distribution panel; no second panel is represented by this symbol.
Sources: [C11]
↑ Reading guide index
FACILITY EXAMPLE
Edge installation
One or more integrated IT enclosures close to the users or process they serve.
- Commercial model
- internal or provider
- Workload
- general purpose
- Construction / packaging
- integrated enclosure
- Deployment role
- near users
Sources: [T02] [T03] [T10]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: dx-room
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
Some upstream building services are shown faded outside the local installation boundary.
No local generator is drawn; UPS autonomy and business continuity are not estimated.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 24
- Modeled racks
- 4
- Rack-group allocation
- 4 × 6 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one edge installation with one or more integrated enclosures
- Enclosures
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 60
- Modeled racks
- 10
- Rack-group allocation
- 10 × 6 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one edge installation with one or more integrated enclosures
- Enclosures
- 2
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 120
- Modeled racks
- 20
- Rack-group allocation
- 20 × 6 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one edge installation with one or more integrated enclosures
- Enclosures
- 4
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Power path
Shared supply → host-building panel → local UPS → rack outlets → server power supply
Utility feed → Transformer → Power distribution panel → Uninterruptible power supply → Rack power distribution unit → Server power supply
energy flow
Substation denotes an upstream functional zone; transformer denotes its or the service voltage-conversion equipment, not a mandatory extra series device.
UPS bypass paths, breakers, protection, redundant feeds, battery-converter architecture and control sequences are intentionally omitted.
For small examples upstream shared-building equipment is faded outside the local boundary.
The panel in this selected example is upstream of the local UPS. Larger systems may have an additional downstream IT distribution panel; no second panel is represented by this symbol.
Sources: [C11]
↑ Reading guide index
FACILITY EXAMPLE
Enterprise data center
Dedicated organizational IT and its supporting facility systems.
- Commercial model
- internal
- Workload
- general purpose
- Construction / packaging
- conventional building
- Deployment role
- central
Sources: [T02] [T03]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: chilled-air-cooled
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 400
- Modeled racks
- 50
- Rack-group allocation
- 50 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one internal IT building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 1000
- Modeled racks
- 125
- Rack-group allocation
- 125 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one internal IT building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 2000
- Modeled racks
- 250
- Rack-group allocation
- 250 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one internal IT building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
↑ Reading guide index
FACILITY EXAMPLE
Colocation facility
Shared facility services support separate tenant IT zones.
- Commercial model
- multi tenant provider
- Workload
- general purpose
- Construction / packaging
- conventional building
- Deployment role
- central
Sources: [T02] [T03]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: chilled-tower
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
The drawing is a retail colocation example with customer cabinets or cages. Wholesale arrangements can allocate a suite or hall; electrical, cooling and operating responsibilities depend on the contract.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 2000
- Modeled racks
- 250
- Rack-group allocation
- 250 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one multi-tenant building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 5000
- Modeled racks
- 625
- Rack-group allocation
- 625 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one multi-tenant building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 10000
- Modeled racks
- 1250
- Rack-group allocation
- 1250 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one multi-tenant building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
↑ Reading guide index
FACILITY EXAMPLE
Hyperscale/cloud campus
Repeated buildings and halls aggregate cloud-computing capacity.
- Commercial model
- cloud operator
- Workload
- general purpose
- Construction / packaging
- multi building campus
- Deployment role
- central
Sources: [T02] [T03]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: chilled-air-cooled
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
The general-purpose IT and air-cooled chillers are selected examples. Other campuses combine different workloads and plant designs; economizers can reduce compressor cooling under suitable outdoor conditions and are not drawn here.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 20000
- Modeled racks
- 2500
- Rack-group allocation
- 2500 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- a multi-building campus
- Buildings
- 2
- Halls
- 4
- IT kW per building
- 10000
- IT kW per hall
- 5000
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 40000
- Modeled racks
- 5000
- Rack-group allocation
- 5000 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- a multi-building campus
- Buildings
- 4
- Halls
- 8
- IT kW per building
- 10000
- IT kW per hall
- 5000
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 80000
- Modeled racks
- 10000
- Rack-group allocation
- 10000 × 8 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- a multi-building campus
- Buildings
- 8
- Halls
- 16
- IT kW per building
- 10000
- IT kW per hall
- 5000
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
↑ Reading guide index
FACILITY EXAMPLE
Superintelligence Factory
Accelerated compute with a liquid-cooled example and a separate residual-air path.
- Commercial model
- internal or provider
- Workload
- accelerated computing
- Construction / packaging
- conventional building
- Deployment role
- central
Sources: [T02] [T03]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: liquid-dry-plus-dx
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
The 80 kW compute-rack and 10 kW support-rack allocations are editorial choices, not a cited product specification or cooling threshold.
Dry-cooler operation is illustrative under suitable design conditions; a chiller or other heat-rejection arrangement may be necessary.
Direct-to-chip cooling leaves residual air heat; no liquid-capture percentage is assumed.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 6000
- Modeled racks
- 110
- Rack-group allocation
- 70 × 80 kW — accelerated compute; 40 × 10 kW — network and storage
- Evidence class
- editorial-assumption
- Scope
- one accelerated-computing building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 12000
- Modeled racks
- 220
- Rack-group allocation
- 140 × 80 kW — accelerated compute; 80 × 10 kW — network and storage
- Evidence class
- editorial-assumption
- Scope
- one accelerated-computing building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 24000
- Modeled racks
- 440
- Rack-group allocation
- 280 × 80 kW — accelerated compute; 160 × 10 kW — network and storage
- Evidence class
- editorial-assumption
- Scope
- one accelerated-computing building
- Buildings
- 1
- Halls
- 1
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
↑ Reading guide index
FACILITY EXAMPLE
Prefabricated modular site
IT and support modules are assembled into one site.
- Commercial model
- internal or provider
- Workload
- general purpose
- Construction / packaging
- prefabricated modules
- Deployment role
- site dependent
Sources: [T02] [T03] [T08]
Configuration boundary
Included means part of the teaching diagram, including labeled upstream/shared context; alternatives and not-shown are not installed in this selected diagram.
Cooling arrangement: dx-room
Included in this teaching example
Other configurations; not installed in this drawing
Not shown in this example
Example limits
Component dispositions describe this example, not all real facilities in this category.
Size presets change the illustrative IT allocation and repeated blocks; they do not size electrical or cooling equipment.
All support-plant icons are functional symbols, not quantities, redundancy claims, or equipment ratings.
No generator or transfer switch is installed in this selected modular example; prefabrication does not establish a resilience level.
Three illustrative presets
Compact — Illustrative configuration
- IT allocation (kW)
- 100
- Modeled racks
- 10
- Rack-group allocation
- 10 × 10 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one modular installation; moduleCount counts IT modules only, excluding symbolic support assemblies
- IT modules
- 1
- IT kW per module
- 100
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Reference — Illustrative configuration
- IT allocation (kW)
- 300
- Modeled racks
- 30
- Rack-group allocation
- 30 × 10 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one modular installation; moduleCount counts IT modules only, excluding symbolic support assemblies
- IT modules
- 3
- IT kW per module
- 100
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
Expanded — Illustrative configuration
- IT allocation (kW)
- 600
- Modeled racks
- 60
- Rack-group allocation
- 60 × 10 kW — mixed IT allocation including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one modular installation; moduleCount counts IT modules only, excluding symbolic support assemblies
- IT modules
- 6
- IT kW per module
- 100
Design allocation to IT; not measured demand, nameplate equipment capacity, or total facility service.
Representative equipment symbols only; not a physical floor plan or an exact equipment count.
↑ Reading guide index
FACILITY EXAMPLE
Home lab
Personal compute, storage and networking in a shared home workspace.
- Commercial model
- personal
- Workload
- learning and self hosting
- Construction / packaging
- desk or small rack
- Deployment role
- home
Sources: [T11] [C14] [C15]
Configuration boundary
Included means selected lab equipment or labeled shared home context. Not-shown components are not installed or promised by this drawing.
Cooling arrangement: shared-room-air
Included in this teaching example
Outside this selected home-lab example
Not shown in this example
Example limits
Every preset is a hypothetical IT power allocation, not measured demand, electrical advice, or permission to load a household circuit.
One rack count means one equipment grouping; compact is a desk shelf, larger examples use a compact rack.
No utility plant, generator, dedicated air conditioner, liquid cooling, carrier entrance or meet-me room is installed in this example.
The existing home circuit, ISP service and room environment are shared context; their capacity and performance have not been assessed.
The illustrated UPS does not imply uninterrupted internet service or a specified runtime.
Three illustrative presets
Desk shelf — Illustrative configuration
- IT allocation (kW)
- 0.15
- Equipment groupings
- 1
- Rack-group allocation
- 1 × 0.15 kW — one desk/rack-equivalent grouping including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one desk shelf in a shared home workspace
- Rooms
- 1
- equipmentGroupCount
- 1
Editorial allocation to IT equipment only; not measured demand, nameplate capacity, allowable circuit loading, or total household demand.
One representative desk/rack equipment grouping; artwork is not an exact inventory or dimensioned floor plan.
Compact rack — Illustrative configuration
- IT allocation (kW)
- 0.4
- Equipment groupings
- 1
- Rack-group allocation
- 1 × 0.4 kW — one desk/rack-equivalent grouping including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one compact rack in a shared home workspace
- Rooms
- 1
- equipmentGroupCount
- 1
Editorial allocation to IT equipment only; not measured demand, nameplate capacity, allowable circuit loading, or total household demand.
One representative desk/rack equipment grouping; artwork is not an exact inventory or dimensioned floor plan.
Expanded lab — Illustrative configuration
- IT allocation (kW)
- 0.8
- Equipment groupings
- 1
- Rack-group allocation
- 1 × 0.8 kW — one desk/rack-equivalent grouping including compute, network and storage
- Evidence class
- editorial-assumption
- Scope
- one compact rack with additional lab equipment in a shared home workspace
- Rooms
- 1
- equipmentGroupCount
- 1
Editorial allocation to IT equipment only; not measured demand, nameplate capacity, allowable circuit loading, or total household demand.
One representative desk/rack equipment grouping; artwork is not an exact inventory or dimensioned floor plan.
↑ Reading guide index
Equipment guide
Data center building · Data hall · Utility feed · On-site substation · Transformer · Switchgear · Transfer switch · Backup generator · Uninterruptible power supply · UPS energy storage · Power distribution panel · Rack power distribution unit · Server power supply · Hot and cold aisle separation · Room air cooling unit · Chiller · Cooling tower · Dry cooler · Cooling pump · Facility cooling loop · Coolant distribution unit · IT coolant loop · Rack liquid manifold · Chip cold plate · Liquid leak detection · Equipment rack · Server · CPU · GPU accelerator · Working memory · Storage drive · Network interface · Network switch · Shared storage system · Fiber entry · Meet-me room · Server fan · Access control · Security camera · Fire detection · Fire suppression · Facility monitoring system · Home broadband gateway
site building
Data center building
The building protects the computing equipment and houses its support systems.
- How it works
- It provides controlled spaces for IT, electrical equipment, cooling, network entry, and staff.
- Why it matters
- Its layout shapes the site's power, cooling, security, and room for growth.
- Presence rule
- Show for a building-based site; use a modular or container shell for prefabricated sites.
- Variants
- purpose-built building · converted building · prefabricated module
- Limit
- The shell alone says nothing about available capacity or reliability.
Connected parts: Data hall, Utility feed, Fiber entry, Access control
Sources: [C01] [C02]
↑ Equipment index
site building
Data hall
The data hall is the room where racks of computing equipment operate.
- How it works
- Rows of racks receive power, network links, and cooling through the room's infrastructure.
- Why it matters
- The room layout controls equipment access and the movement of cooling air.
- Presence rule
- Show for most sites, but a small installation may use a single room or enclosure rather than a dedicated hall.
- Variants
- open room · caged colocation area · modular hall
- Limit
- A data hall may contain several different rack and cooling types.
Connected parts: Equipment rack, Hot and cold aisle separation, Power distribution panel, Fire detection
Sources: [C01] [C03]
↑ Equipment index
power
Utility feed
The utility feed brings grid electricity to the site.
- How it works
- A service connection delivers power to the site's electrical intake and protection equipment.
- Why it matters
- The available service sets a major limit on the site's usable electrical load.
- Presence rule
- Show for a grid-connected site; some remote or special-purpose sites use another primary source.
- Variants
- single service · multiple services · campus distribution feed
- Limit
- A drawn feed does not prove firm capacity or diverse utility routes.
Connected parts: On-site substation, Transformer, Switchgear
Sources: [C01] [C11]
↑ Equipment index
power
On-site substation
A substation receives higher-voltage power and prepares it for site distribution.
- How it works
- Transformers, breakers, and controls step and route incoming power through the site.
- Why it matters
- Large campuses may need it to serve loads beyond a simple building service.
- Presence rule
- Show only when the site has a dedicated substation; many smaller facilities rely on utility-owned or shared equipment.
- Variants
- utility-owned · customer-owned · campus substation
- Limit
- Ownership and exact voltage are site-specific.
Connected parts: Utility feed, Transformer, Switchgear
Sources: [C11]
↑ Equipment index
power
Transformer
A transformer changes AC voltage to a level another part of the site can use.
- How it works
- An alternating magnetic field transfers energy between windings by induction, producing the voltage needed on the secondary side.
- Why it matters
- Voltage conversion lets high-voltage supply serve lower-voltage equipment safely.
- Presence rule
- Show when voltage transformation occurs within the explored site boundary.
- Variants
- medium-to-low-voltage · distribution transformer · transformer within a power distribution unit
- Limit
- The number and location of transformers vary by electrical design.
Connected parts: Utility feed, On-site substation, Switchgear
Sources: [C01] [C11]
↑ Equipment index
power
Switchgear
Switchgear protects and routes major electrical circuits.
- How it works
- Breakers and control devices disconnect faults or select which circuits receive power.
- Why it matters
- It allows electrical sections to be protected, isolated, and maintained.
- Presence rule
- Show for facilities with site-level electrical distribution; a small room may use simpler panels.
- Variants
- medium-voltage · low-voltage · switchboard
- Limit
- The diagram simplifies actual protection and switching sequences.
Connected parts: Transformer, Transfer switch, Uninterruptible power supply, Power distribution panel
Sources: [C01] [C11]
↑ Equipment index
power
Transfer switch
A transfer switch changes a load between normal and alternate power sources.
- How it works
- It moves a connected circuit to backup generation when the primary supply fails or is isolated.
- Why it matters
- It coordinates the shift to a backup source without treating the generator as instantaneous power.
- Presence rule
- Show when the site has alternate power requiring transfer; exact switching can be integrated into other gear.
- Variants
- automatic transfer switch · manual transfer · integrated transfer controls
- Limit
- Its position relative to a UPS varies by site design.
Connected parts: Switchgear, Backup generator, Uninterruptible power supply
Sources: [C01] [C11]
↑ Equipment index
power
Backup generator
A generator can provide electricity during a prolonged utility outage.
- How it works
- An engine or turbine drives the generator. Once its voltage and frequency are acceptable, transfer equipment connects the selected loads.
- Why it matters
- It can support loads longer than a short-duration UPS energy store.
- Presence rule
- Show only where on-site backup generation is installed; some facilities have no generator.
- Variants
- diesel · natural gas · other prime mover
- Limit
- Runtime depends on fuel, maintenance, load, and operating arrangements.
Connected parts: Transfer switch, Switchgear
Sources: [C03] [C11]
↑ Equipment index
power
Uninterruptible power supply
A UPS keeps selected loads powered through a short supply interruption.
- How it works
- Power electronics and stored energy bridge the gap while another source starts or service returns.
- Why it matters
- It helps prevent abrupt shutdowns during power disturbances.
- Presence rule
- Show for loads selected for UPS protection. Some scientific-computing sites protect only part of the IT load; other designs distribute energy storage at rack level.
- Variants
- central battery UPS · rack-level UPS · rotary UPS
- Limit
- A UPS is not a long-duration replacement for a generator.
Connected parts: Switchgear, Transfer switch, UPS energy storage, Power distribution panel
Sources: [C01] [C11]
↑ Equipment index
power
UPS energy storage
Energy storage supplies short-term power to a UPS-backed load.
- How it works
- A battery or another storage device releases energy during an input outage.
- Why it matters
- It gives transfer or orderly shutdown time when grid power is lost.
- Presence rule
- Show with an energy-storage UPS; omit for designs without one or use the correct nonbattery storage type.
- Variants
- lead-acid battery · lithium-ion battery · flywheel
- Limit
- Storage duration must be designed for the actual supported load.
Connected parts: Uninterruptible power supply
Sources: [C01] [C11]
↑ Equipment index
power
Power distribution panel
A distribution panel divides an incoming electrical supply into protected outgoing circuits.
- How it works
- Circuit breakers protect and isolate outgoing circuits. A panel may feed a UPS or distribute its output toward IT, depending on its position in the electrical design.
- Why it matters
- It defines a distribution boundary. Panels upstream and downstream of a UPS are separate devices with different roles.
- Presence rule
- Show where the selected design needs circuit distribution. The small-site examples use a host-building panel upstream of the UPS; the large-site examples show IT distribution downstream.
- Variants
- host-building panelboard · floor PDU · remote power panel · busway tap
- Limit
- Do not confuse this facility distribution point with a rack PDU.
Connected parts: Switchgear, Uninterruptible power supply, Rack power distribution unit
Sources: [C01] [C11]
↑ Equipment index
power
Rack power distribution unit
A rack PDU provides power outlets inside an equipment rack.
- How it works
- It takes a rack feed and distributes it to server and network device power supplies.
- Why it matters
- It is the visible handoff between building power and individual devices.
- Presence rule
- Show for a rack with outlet-based distribution; some rack designs use busbars or integrated power shelves.
- Variants
- basic strip · metered rack PDU · switched rack PDU
- Limit
- Outlet count and redundancy are rack-specific.
Connected parts: Power distribution panel, Equipment rack, Server power supply
Sources: [C01] [C11]
↑ Equipment index
power
Server power supply
A server power supply converts rack power for the computer's electronics.
- How it works
- It changes incoming power into regulated voltages used by boards, drives, and fans.
- Why it matters
- It supplies DC power to the server; onboard regulators provide the lower voltages needed by processors and other components.
- Presence rule
- Show inside a conventional server; integrated DC rack designs may use a shared power shelf instead.
- Variants
- single supply · redundant hot-swap supplies · shared rack power shelf
- Limit
- A redundant PSU does not prove independent upstream power paths.
Connected parts: Rack power distribution unit, Server, CPU, GPU accelerator
Sources: [C06] [C11]
↑ Equipment index
cooling
Hot and cold aisle separation
Aisle separation helps keep cool supply air apart from warm server exhaust.
- How it works
- Rack orientation, doors, panels, or partitions guide the two air streams.
- Why it matters
- Less mixing makes cooling more predictable and efficient.
- Presence rule
- Show where the room uses aisle arrangement or physical containment; a small room may have no enclosure.
- Variants
- hot aisle containment · cold aisle containment · open hot/cold aisle layout
- Limit
- Containment does not replace cooling equipment.
Connected parts: Data hall, Equipment rack, Server fan, Room air cooling unit
Sources: [C01] [C02] [C03]
↑ Equipment index
cooling
Room air cooling unit
A room cooling unit removes heat from data hall air.
- How it works
- Fans move warm return air across a chilled-water or refrigerant coil and send cooler air back.
- Why it matters
- It controls the heat left in room air, including heat not captured by liquid cooling.
- Presence rule
- Show when room air is actively cooled; select the correct unit type for the design.
- Variants
- CRAH chilled-water air handler · CRAC direct-expansion unit · in-row cooler
- Limit
- A CRAH and a CRAC use different cooling circuits.
Connected parts: Hot and cold aisle separation, Server fan, Chiller, Facility cooling loop
Sources: [C01] [C02] [C03]
↑ Equipment index
cooling
Chiller
A chiller makes a circulating fluid cold enough for a cooling load.
- How it works
- A refrigeration cycle moves heat from chilled fluid to an outdoor air or condenser-water path.
- Why it matters
- It can provide cooling when a direct outdoor heat-rejection path is too warm.
- Presence rule
- Show only for a chilled-fluid design; free cooling, direct expansion, or warmer liquid loops may omit it.
- Variants
- air-cooled chiller · water-cooled chiller
- Limit
- A cooling tower rejects heat, while a chiller actively lowers fluid temperature. A water-side economizer can reduce or bypass compressor cooling when outdoor conditions and the plant arrangement permit; pumps and fans still consume energy.
Connected parts: Room air cooling unit, Facility cooling loop, Cooling tower, Dry cooler
Sources: [C01] [C02] [C03]
↑ Equipment index
cooling
Cooling tower
A cooling tower rejects heat outdoors by evaporating some water.
- How it works
- Air passing across warm water carries away heat as part of that water evaporates.
- Why it matters
- It can reject large heat loads but uses makeup water and needs water management.
- Presence rule
- Show only for wet or hybrid heat rejection; dry and air-cooled systems may have no tower.
- Variants
- open evaporative tower · closed-circuit evaporative cooler · hybrid tower
- Limit
- A cooling tower is not itself a chiller.
Connected parts: Chiller, Facility cooling loop
Sources: [C02] [C03] [C10]
↑ Equipment index
cooling
Dry cooler
In dry operation, a dry cooler transfers heat from a fluid loop to outdoor air without evaporating water.
- How it works
- Fans pass ambient air over a finned fluid coil. Adiabatic-assisted variants can evaporate water to pre-cool the entering air when conditions require it.
- Why it matters
- It can support water-saving heat rejection when temperatures and equipment allow.
- Presence rule
- Show only for an air-to-fluid outdoor rejection path; other designs use a tower or air-cooled condenser.
- Variants
- fluid cooler · adiabatic-assisted dry cooler
- Limit
- Cooling capacity depends on ambient air and required fluid temperatures. Adiabatic assistance uses water when enabled; dry operation alone does not establish annual water use.
Connected parts: Facility cooling loop, Chiller
Sources: [C03] [C04] [C05]
↑ Equipment index
cooling
Cooling pump
A pump keeps coolant moving through a liquid loop.
- How it works
- It creates the pressure difference that pushes fluid through piping and heat exchangers.
- Why it matters
- Lost flow can quickly reduce heat removal from liquid-cooled equipment.
- Presence rule
- Show on pumped liquid loops; air-only cooling may use fans instead.
- Variants
- facility pump · CDU secondary pump · redundant pump set
- Limit
- The pump location and redundancy vary by loop design.
Connected parts: Facility cooling loop, IT coolant loop, Coolant distribution unit
Sources: [C01] [C04] [C05]
↑ Equipment index
cooling
Facility cooling loop
A facility loop carries heat between indoor cooling equipment and the plant or outdoors.
- How it works
- Pipes circulate water or another fluid through pumps, heat exchangers, and heat rejection equipment.
- Why it matters
- It is the building-side path that takes heat away from rooms or a CDU.
- Presence rule
- Show for hydronic cooling; direct-expansion and some air-cooled schemes use other fluid paths.
- Variants
- chilled-water loop · condenser-water loop · warm-water loop
- Limit
- Some plants have multiple separate facility loops rather than one circuit.
Connected parts: Cooling pump, Coolant distribution unit, Chiller, Cooling tower, Dry cooler
Sources: [C02] [C03] [C04]
↑ Equipment index
cooling
Coolant distribution unit
A CDU transfers heat between the IT coolant loop and the facility cooling loop.
- How it works
- A heat exchanger separates the fluids while controls and often pumps manage IT-side flow and temperature.
- Why it matters
- It protects sensitive IT coolant conditions from the building-side circuit.
- Presence rule
- Show for a liquid design with a CDU; some designs place its function inside a rack or use another boundary.
- Variants
- in-rack CDU · row CDU · facility CDU
- Limit
- A CDU moves heat; it does not make all room-air cooling unnecessary.
Connected parts: Facility cooling loop, IT coolant loop, Cooling pump, Liquid leak detection
Sources: [C03] [C04] [C05]
↑ Equipment index
cooling
IT coolant loop
The IT coolant loop carries heat away from liquid-cooled computing parts.
- How it works
- Supply fluid flows toward cold plates and warm return fluid flows back toward a CDU or other exchanger.
- Why it matters
- Its temperature, pressure, cleanliness, and flow affect hardware reliability.
- Presence rule
- Show only where liquid-cooled IT is installed.
- Variants
- water-based secondary loop · glycol-compatible loop · vendor-specific coolant
- Limit
- Coolant chemistry and connectors must match the actual equipment.
Connected parts: Coolant distribution unit, Rack liquid manifold, Cooling pump, Chip cold plate, Liquid leak detection
Sources: [C03] [C04] [C05]
↑ Equipment index
cooling
Rack liquid manifold
A rack manifold divides coolant supply and return among devices in one rack.
- How it works
- Branch connections route supply fluid to servers and collect their warm return fluid.
- Why it matters
- It makes many liquid-cooled devices serviceable from shared rack piping.
- Presence rule
- Show for rack-based liquid distribution; some systems distribute at the row or equipment level.
- Variants
- rack-mounted manifold · row manifold · integrated manifold
- Limit
- Supply and return are distinct paths, even if drawn as one object.
Connected parts: IT coolant loop, Equipment rack, Chip cold plate
Sources: [C04]
↑ Equipment index
cooling
Chip cold plate
A cold plate picks up heat directly from a hot chip.
- How it works
- Coolant flows through channels in a metal plate attached to a CPU or GPU.
- Why it matters
- It carries a large share of chip heat into a liquid loop near the source.
- Presence rule
- Show only for direct-to-chip liquid-cooled devices.
- Variants
- CPU plate · GPU plate · multi-chip plate
- Limit
- Other components can still release heat into the room air.
Connected parts: CPU, GPU accelerator, Rack liquid manifold, IT coolant loop
Sources: [C03] [C04] [C05]
↑ Equipment index
cooling
Liquid leak detection
Leak sensors alert operators when cooling fluid escapes its intended path.
- How it works
- Compatible sensing cables or point sensors detect escaped coolant and signal an alarm. The sensor must be selected for the fluid; a water-sensing cable may not detect a dielectric coolant.
- Why it matters
- Early warning supports a response before a leak damages IT equipment.
- Presence rule
- Show where liquid piping runs near IT; the sensor design varies by site.
- Variants
- sensing cable · point sensor · integrated CDU alarm
- Limit
- Detection does not by itself stop a leak.
Connected parts: IT coolant loop, Coolant distribution unit, Facility monitoring system
Sources: [C04] [C05]
↑ Equipment index
it network
Equipment rack
A rack holds servers, storage, and network devices in an organized frame.
- How it works
- It stacks serviceable equipment and provides routes for power, cables, and sometimes coolant.
- Why it matters
- Racks turn individual devices into manageable rows of IT capacity.
- Presence rule
- Show for rack-mounted IT; some modular or custom systems use other frames.
- Variants
- standard rack · high-density rack · liquid-ready rack
- Limit
- Rack power rating does not reveal actual installed or usable load.
Connected parts: Data hall, Rack power distribution unit, Server, Network switch, Rack liquid manifold
Sources: [C01] [C04] [C06]
↑ Equipment index
it network
Server
A server runs software workloads on processors, memory, and storage.
- How it works
- Its CPU or GPUs process instructions while memory and drives hold working data and files.
- Why it matters
- It is the computing endpoint that power, cooling, and networking support.
- Presence rule
- Show where compute servers are installed; a network-only or storage-only room may have other IT devices.
- Variants
- general-purpose server · GPU server · blade or sled
- Limit
- A GPU server is one server type, not every server in a data center.
Connected parts: Equipment rack, CPU, GPU accelerator, Working memory, Storage drive, Network interface, Server power supply, Server fan
Sources: [C01] [C06]
↑ Equipment index
it network
CPU
A CPU runs general-purpose instructions and coordinates a server's work.
- How it works
- It executes operating-system and application tasks while exchanging data with memory and devices.
- Why it matters
- Nearly every conventional server needs a processor to manage its workloads.
- Presence rule
- Show inside conventional servers and storage controllers; a custom accelerator module may use a different host arrangement.
- Variants
- x86 CPU · Arm CPU · other server processor
- Limit
- CPU count and role depend on the server design.
Connected parts: Server, Working memory, GPU accelerator, Chip cold plate
Sources: [C06] [C16]
↑ Equipment index
it network
GPU accelerator
A GPU speeds up parallel work such as model training or inference.
- How it works
- Many compute units perform numerical operations on data staged in accelerator memory.
- Why it matters
- GPU clusters can greatly increase rack power and cooling needs.
- Presence rule
- Show only in accelerated servers; many data centers and servers have no data-center GPU.
- Variants
- PCIe accelerator · module-based accelerator · integrated accelerator tray
- Limit
- GPU model, count, and cooling method are workload-specific.
Connected parts: Server, CPU, Working memory, Chip cold plate, Network interface
Sources: [C06] [C07]
↑ Equipment index
it network
Working memory
Memory holds data that processors need quickly while work is running.
- How it works
- DRAM holds active instructions and data for processors. System memory modules and accelerator HBM use different packaging and interfaces; HBM is also DRAM.
- Why it matters
- Capacity and bandwidth can limit how much work a server handles at once.
- Presence rule
- Show in servers; the memory packaging differs between CPU and GPU systems.
- Variants
- system DRAM · GPU high-bandwidth memory
- Limit
- Working memory is not the same as persistent storage.
Connected parts: Server, CPU, GPU accelerator, Storage drive
Sources: [C06]
↑ Equipment index
it network
Storage drive
A drive keeps data after the server is powered off.
- How it works
- Flash or magnetic media stores operating-system files, application data, or local cache.
- Why it matters
- It provides persistent data that memory alone cannot retain.
- Presence rule
- Show for servers or storage systems with local drives; some compute nodes boot over a network.
- Variants
- NVMe solid-state drive · SATA solid-state drive · hard disk drive
- Limit
- Local drives may be cache or boot media rather than the main data store.
Connected parts: Server, Working memory, Shared storage system
Sources: [C06]
↑ Equipment index
it network
Network interface
A network interface links a server to the data center network.
- How it works
- A card or onboard port sends and receives data over copper or optical links.
- Why it matters
- It lets compute reach other servers, storage, and users.
- Presence rule
- Show in networked servers; speed and protocol depend on the workload.
- Variants
- Ethernet NIC · InfiniBand adapter · DPU or SmartNIC
- Limit
- An accelerator interconnect inside a server is distinct from its external NIC.
Connected parts: Server, Network switch, GPU accelerator
Sources: [C06] [C07]
↑ Equipment index
it network
Network switch
A switch forwards traffic among connected network devices.
- How it works
- Its ports link server NICs, storage, and upstream networks according to a configured fabric.
- Why it matters
- Switch capacity and topology shape how systems exchange data.
- Presence rule
- Show for multi-device networks; topology may include separate compute, storage, and management fabrics.
- Variants
- Ethernet leaf switch · spine switch · InfiniBand switch
- Limit
- A switch is not the server's CPU or GPU interconnect.
Connected parts: Network interface, Shared storage system, Fiber entry, Meet-me room
Sources: [C07]
↑ Equipment index
it network
Shared storage system
Shared storage serves persistent data to multiple computers over a network.
- How it works
- Controllers and many drives present file, block, or object storage to servers.
- Why it matters
- It separates common data capacity from individual compute servers.
- Presence rule
- Show where shared storage is deployed; some workloads rely on local disks or an external service.
- Variants
- all-flash array · disk-based array · distributed storage nodes
- Limit
- Storage is a separate role even when built from server-like hardware.
Connected parts: Storage drive, Network switch, Server
Sources: [C07] [C13]
↑ Equipment index
it network
Fiber entry
Fiber entry brings outside communications cables into the site.
- How it works
- Conduit and termination points carry optical links toward network rooms or switches.
- Why it matters
- It connects local computing to carriers, customers, and other sites.
- Presence rule
- Show for externally connected sites; entry and demarcation can be shared with another building.
- Variants
- single entrance · diverse entrances · campus fiber link
- Limit
- Two cables do not necessarily mean physically diverse routes.
Connected parts: Meet-me room, Network switch, Data center building
Sources: [C08]
↑ Equipment index
it network
Meet-me room
A meet-me room is a place to connect separate network parties inside a facility.
- How it works
- Patch panels and cross-connects join carrier or customer circuits to internal cabling.
- Why it matters
- It makes interconnection serviceable without moving servers or storage.
- Presence rule
- Show mainly for colocation or carrier-rich facilities; private sites may use a simpler network room.
- Variants
- shared meet-me room · building meet-me room · private interconnect room
- Limit
- A meet-me room is not required for every data center network.
Connected parts: Fiber entry, Network switch
Sources: [C08] [C12]
↑ Equipment index
it network
Server fan
A server fan moves air through heat-producing parts of a server.
- How it works
- It draws cooler intake air across components and pushes warmer air toward the rack exhaust side.
- Why it matters
- Even many liquid-cooled systems still need airflow for components outside cold plates.
- Presence rule
- Show for fan-cooled servers; fanless or fully immersed designs use another internal cooling method.
- Variants
- air-cooled server fan · residual-air fan in liquid-cooled server
- Limit
- Liquid cooling reduces some air load but need not eliminate it.
Connected parts: Server, Hot and cold aisle separation, Room air cooling unit, Chip cold plate
Sources: [C01] [C02] [C03]
↑ Equipment index
security fire operations
Access control
Access control limits who can enter the facility and sensitive rooms.
- How it works
- Badges, locks, identity checks, and alarms grant and record approved entry.
- Why it matters
- It protects equipment and data from unauthorized physical access.
- Presence rule
- Show for controlled facilities; the exact barriers and credentials differ by operator.
- Variants
- badge door · guarded gate · biometric checkpoint
- Limit
- AWS controls are an operator example, not a universal site design.
Connected parts: Data center building, Data hall, Security camera, Facility monitoring system
Sources: [C09]
↑ Equipment index
security fire operations
Security camera
Cameras help staff observe and review physical activity.
- How it works
- Video streams record selected entrances, corridors, and protected spaces.
- Why it matters
- They support intrusion response and investigation.
- Presence rule
- Show where video surveillance is installed; coverage and retention depend on the operator.
- Variants
- perimeter camera · entry camera · room camera
- Limit
- A camera alone does not prevent entry or guarantee complete coverage.
Connected parts: Access control, Facility monitoring system
Sources: [C09]
↑ Equipment index
security fire operations
Fire detection
Fire detection alerts staff to smoke or other signs of a fire.
- How it works
- Sensors report an alarm so people and response systems can act.
- Why it matters
- Early warning protects people and limits damage.
- Presence rule
- Show as a facility life-safety function; sensor type and zoning follow the actual design and local rules.
- Variants
- spot smoke detector · air-sampling detector · other approved detector
- Limit
- Detection and suppression are separate functions.
Connected parts: Data hall, Fire suppression, Facility monitoring system
Sources: [C03] [C09]
↑ Equipment index
security fire operations
Fire suppression
Fire suppression acts to control a fire after detection or activation.
- How it works
- A designed system releases water or another approved agent into a protected zone.
- Why it matters
- It limits fire spread while response procedures protect occupants.
- Presence rule
- Show where the facility has a suppression system; the chosen method is code- and site-specific.
- Variants
- sprinkler · pre-action sprinkler · clean-agent system
- Limit
- The explorer must not imply one agent or layout is universally required.
Connected parts: Fire detection, Data hall, Facility monitoring system
Sources: [C03] [C09]
↑ Equipment index
security fire operations
Facility monitoring system
A monitoring system helps operators watch power, cooling, and alarms.
- How it works
- Sensors and controllers report conditions such as temperature, flow, electrical load, and faults.
- Why it matters
- Operators can spot abnormal conditions before equipment fails or overheats.
- Presence rule
- Show in operated facilities, from simple local alarms to integrated building and data-center systems.
- Variants
- building management system · energy monitoring system · data-center infrastructure management
- Limit
- Monitoring does not itself guarantee automatic correction or resilience.
Connected parts: Switchgear, Room air cooling unit, Coolant distribution unit, Liquid leak detection, Fire detection, Access control
Sources: [C01] [C04] [C09]
↑ Equipment index
it network
Home broadband gateway
The household gateway connects the local network to an internet service.
- How it works
- Routing directs traffic between the home LAN and the provider connection. Modem, optical termination, Wi-Fi and switching may be integrated or separate.
- Why it matters
- It defines the external network connection for this home-lab example; local devices can also communicate within the LAN.
- Presence rule
- Shown for the home-lab example instead of a carrier fiber entrance or meet-me room.
- Variants
- integrated household gateway · router with separate provider modem or optical terminal
- Limit
- The example does not specify access medium, service speed, route diversity, uptime or public inbound access.
Connected parts: Network switch, Network interface
Sources: [C14] [C15]
↑ Equipment index
Glossary
IT capacity
The power allocated for computing, storage, and networking equipment in a defined room, building, or campus. In this exhibit it is an illustrative design allocation, not measured draw, equipment nameplate rating, or total facility power.
Sources: [T06]
IT actual load
The electrical power that installed IT equipment is drawing at a stated time and measurement point. It can change with occupancy and workload, and can be lower than the exhibit's illustrative IT capacity.
Sources: [T06]
Facility power demand
The electrical power drawn by IT and supporting systems at a stated facility boundary and time. Peak demand is a separate measurement from allocated IT capacity or the nameplate rating of equipment.
Sources: [T06]
Facility energy
Energy used over a period by IT equipment and supporting systems such as cooling, electrical distribution, and lighting, within a stated boundary. It is measured in units such as kWh or MWh, not kW or MW.
Sources: [T05] [T06]
kW
Kilowatt: a unit of power, or the rate at which energy is used. One kW equals 1,000 watts.
Sources:
MW
Megawatt: a unit of power equal to 1,000 kW. It describes a rate, not energy accumulated over time.
Sources:
kWh
Kilowatt-hour: a unit of energy equal to using 1 kW of power for one hour. It does not mean one kilowatt of instantaneous demand.
Sources:
MWh
Megawatt-hour: a unit of energy equal to 1,000 kWh. It is energy accumulated over time, not an MW power rating.
Sources:
Rack
A cabinet or frame that holds IT equipment such as servers, storage, switches, and power distribution. A rack symbol in this exhibit can stand for many modeled racks.
Sources: [T03] [C01]
Rack density
Power associated with a rack, commonly expressed as kW per rack. Always check whether a stated figure is a design allocation, measured draw, a typical rack, or a maximum; racks within one facility can differ.
Sources: [T04]
PUE
Power Usage Effectiveness is total facility energy divided by IT equipment energy over the same period and boundary; annual energy is the preferred basis. It is a dimensionless efficiency ratio, not a utility-service MW rating.
Sources: [T05] [T06]
UPS
An uninterruptible power supply uses stored energy and power electronics to bridge interruptions and protect IT power while another source may start or the utility returns. It does not generate electricity indefinitely.
Sources: [C01] [C11]
CDU
A coolant distribution unit moves and controls liquid for IT cooling, often through a heat exchanger that separates the IT coolant from the facility loop. It transfers heat; it is not itself the outdoor heat-rejection device.
Sources: [C04] [C05]
CRAC
A computer room air conditioner cools room air using a refrigeration system. Its heat still needs to be rejected outside the room.
Sources: [C01] [C03]
CRAH
A computer room air handler moves room air across a cooling coil, commonly supplied with chilled water from a separate cooling plant. It is one part of the heat-removal path.
Sources: [C01] [C03]
Direct-to-chip cooling
Liquid carries heat away from cold plates attached to selected hot electronic components, often processors or accelerators. Other server parts can still need air cooling.
Sources: [C03] [C04]
GPU
A graphics processing unit is a processor suited to highly parallel calculations, including model training, inference, and scientific computing. A server can have GPUs, CPUs, or both.
Sources: [T03] [C06]
CPU
A central processing unit runs general instructions and coordinates work inside a computer. It is distinct from a GPU, which is built for many parallel calculations.
Sources: [C06]
NIC
A network interface card connects a server to a data network so it can send and receive information. It is distinct from the network switch that connects many devices.
Sources: [C06] [C07]
N
The amount of equipment capacity needed to serve a stated design load, before adding spare capacity. N alone does not establish an Uptime Tier or a promise of uptime.
Sources: [T07] [C01]
N+1
The equipment capacity needed for the design load plus one extra unit or capacity element under a stated design assumption. This shorthand alone does not establish an Uptime Tier or a promise of uptime.
Sources: [T07] [C01]
2N
Two sets of equipment, each intended to carry the stated design load by itself, subject to the actual system design. This shorthand alone does not establish an Uptime Tier or a promise of uptime.
Sources: [T07] [C01]
Tier
Uptime Institute's Tier I–IV classifications describe site-infrastructure topology and its maintenance and fault capabilities, not data-center size. A fictional example here has no Tier certification; N, N+1, or 2N notation alone does not establish one.
Sources: [T07]
Colocation
A provider-operated facility in which multiple customers place IT equipment and use the provider's space, power, cooling, security, and connections. Retail colocation commonly allocates cabinets or cages; wholesale arrangements may allocate suites or halls, with responsibilities set by contract. Either can host accelerated computing, including the equipment shown in the Superintelligence Factory.
Sources: [T02]
Hyperscale
Large-scale data-center operations that support cloud, internet, or digital-platform services, often through repeated facilities or halls. The term has no single universal rack-count or MW cutoff in this exhibit.
Sources: [T02] [T09]
Edge
A deployment near users, devices, or data sources so processing can happen closer to where information is produced or consumed. Edge describes a location role, not an exact power or rack size.
Sources: [T02]
Modular
A data-center approach using repeatable, pre-engineered assemblies for IT, power, or cooling that can be combined at a site. Modular does not necessarily mean a shipping container, a fixed size, or a particular ownership model.
Sources: [T08]
Economizer (free cooling)
Uses suitable outdoor conditions to reduce compressor cooling. Air-side systems use outdoor air, with appropriate air-quality and humidity controls; water-side systems transfer heat through a heat exchanger to outdoor heat rejection. Fans and pumps still use energy. Feasibility depends on climate, temperatures and the plant design; economizers are not drawn in these examples.
Sources: [C01] [C02]